Wesley Center Wastewater Treatment Plant

Client

Pasco County

Location

7501 Boyette Road, Wesley Chapel, FL

Size

9 million gallons per day

Project Description

Pasco County BOCC selected Vogel Bros. Building Co. to expand the Wesley Center Wastewater Treatment Facility from 6.0 million gallons per day (mgd) average annual daily flow (AADF) to 9.0 mgd AADF. The project included constructing a new headworks structure consisting of a new cast-in-place concrete structure with two new coarse mechanically rake cleaned screens with compactors, one new manual cleaned bar screen, two new fine mechanically cleaned perforated plate screens with compactors, two new grit collection units with two new grit classifiers and two new grit pumps, walkway bridge, and new slide gates. Rehabilitation of all biological basins including draining, removing debris, cleaning, coating removal, concrete repair, installation of new fine bubble diffusers, piping, valves, modifications to the internal concrete walls, and new submersible mixers. Construction of a new blower building and installation of blowers and associated air piping to supply air to the biological basins. Construction of two new chlorine contact tanks consisting of cast-in-place concrete, piping, valves, slide gates, vertical transfer pumps. Demolition and removal of existing internal recycle pump systems. Construction of two new dry pit pump systems including 5 pumps at each station.

Related Projects

Clermont East Side Water Reclamation Facility Expansion

City Of Clermont

Sunshine Water Services Mid-County WWTP MBR Improvements

Sunshine Water Services

Manatee NWWRF Equalization Tanks

Manatee County

Haines City WWTP

Haines City

Sunbridge Water Treatment Plant – Tavistock Dev.

Tavistock Development

Hillsborough County NW Regional Sludge Management Facility

Hillsborough County

Cherry Hill Water Production Facility

Polk County

Manatee Water Treatment Plant – Biological Treatment Unit

Manatee County