Vogel Bros. Building Co. is serving as the Design-Builder for Pasco County’s Land O’ Lakes Wastewater Treatment Plant Improvements & Expansion, a major modernization and expansion of the County’s wastewater treatment infrastructure.
The project includes extensive improvements to the existing operating facility, incorporating new and upgraded treatment processes, filtration, aeration, solids handling, electrical and standby power systems, process piping, instrumentation and controls, and associated site infrastructure. Construction will require carefully planned sequencing, tie-ins, and commissioning to maintain continuous plant operations throughout the improvements.
Through the Progressive Design-Build process, Vogel Bros. has worked collaboratively with Pasco County, the design team, key trade partners, and equipment manufacturers to integrate design, constructability, procurement, cost development, and operational considerations early in the project.
With a Phase 2 contract value of approximately $142 million, the Land O’ Lakes project represents one of Vogel Bros.’ significant Florida water and wastewater infrastructure projects and demonstrates our ability to deliver complex treatment facility improvements within an active operating environment.
Rendering shown represents the planned facility improvements and is intended to illustrate the anticipated scale and configuration of the completed project.