Sampey and Sunshine WWTF Upgrades – In Construction

Client

City of Groveland

Location

Lakeland, FL

Size

6.18 Millions of Gallons Per Day

Project Description

The City of Groveland’s Sampey and Sunshine Wastewater Treatment Facility Upgrades represent a comprehensive expansion and modernization of the City’s wastewater treatment infrastructure. The project significantly increases the Sampey facility’s treatment capacity, with a peak instantaneous design flow of 6.18 MGD, compared with 2.7 MGD under the existing hydraulic configuration.

The improvements encompass nearly every major treatment process at the Sampey facility. The project adds two new oxidation ditches and two new secondary clarifiers, bringing the proposed treatment configuration to four oxidation ditches and four clarifiers. Additional work includes headworks upgrades, new clarifier distribution facilities, RAS/WAS pumping improvements, tertiary disk filtration, in-plant recycle and reuse pumping, improvements to the chlorine contact system, and construction of a 1.5-million-gallon reject water storage tank.

Supporting improvements include extensive process and yard piping, rehabilitation of existing aerobic digesters, a new electrical building, emergency power, upgraded electrical distribution and controls, and site, grading, drainage and access improvements. The project also includes upgrades to the Sunshine WWTF headworks, integrating improvements across the City’s wastewater treatment system.

A key challenge of the project is completing this extensive work while maintaining continuous treatment operations. Both the Sampey Road WWTF and Sunshine Headworks are required to remain fully operational throughout construction, requiring careful sequencing, temporary systems, utility coordination and close collaboration with City operations.

Portfolio Highlights: 6.18 MGD peak instantaneous design flow • Two new oxidation ditches • Two new secondary clarifiers • 1.5 MG reject water storage tank • Headworks and tertiary filtration upgrades • RAS/WAS and reuse pumping improvements • New electrical building and emergency power • Extensive process piping, electrical, controls and site improvements • Construction within active wastewater treatment facilities.

Related Projects

Land O’Lakes Wastewater Treatment Plant Rehabilitation & Expansion – In Construction

Pasco County

Sampey and Sunshine WWTF Upgrades – In Construction

City of Groveland

Glendale Water Reclamation Facility – Chlorine Contact Chamber & Effluent Pumping – In Construction

City of Lakeland

Clermont East Side Water Reclamation Facility Expansion

City Of Clermont

Sunshine Water Services Mid-County WWTP MBR Improvements

Sunshine Water Services

Manatee NWWRF Equalization Tanks

Manatee County

Haines City WWTP

Haines City

Sunbridge Water Treatment Plant – Tavistock Dev.

Tavistock Development