Vogel Bros. served as the General Contractor for targeted upgrades to improve water quality control and system reliability at the treatment facility.
The project included demolition and removal of the existing hydropneumatic tank and installation of a new carbon dioxide storage and feed system to provide precise pH adjustment. Scope of work encompassed equipment installation, piping modifications, controls integration, and associated structural and site improvements to support the new system.
Careful coordination of mechanical, electrical, and instrumentation components ensured seamless integration into the existing facility while maintaining ongoing operations. Through efficient execution and attention to safety, Vogel Bros. successfully delivered a modernized pH control solution that enhances treatment performance and long-term operational stability.