Sanford North Water Reclamation Facility

Client

City of Sanford

Location

1201 W. Seminole Boulevard, Sanford, FL

Size

7.3 million gallons per day

Project Description

Vogel Bros. Building Co. built and integrated a Fixed-Film Activated Sludge Process (IFAS) BNR Treatment System consisting of primary anoxic basins, aerobic basins, deoxygenation basins, secondary anoxic basins, reaeration basins. This system required structural additions to the existing aeration basins by the construction of new 16’ high walls. Staff installed turbo blowers, piping & diffusers, and submersible mixers. The Grit Removal System was modified and the RAS/WAS pumping system was improvements with new pumps. A new Blower Facility Building and associated equipment, piping, & appurtenances was built. Also new electrical building and chemical feed building were built to protect the new electrical gear and chemical feed systems required by this project.

Related Projects

Clermont East Side Water Reclamation Facility Expansion

City Of Clermont

Sunshine Water Services Mid-County WWTP MBR Improvements

Sunshine Water Services

Manatee NWWRF Equalization Tanks

Manatee County

Haines City WWTP

Haines City

Sunbridge Water Treatment Plant – Tavistock Dev.

Tavistock Development

Hillsborough County NW Regional Sludge Management Facility

Hillsborough County

Cherry Hill Water Production Facility

Polk County

Manatee Water Treatment Plant – Biological Treatment Unit

Manatee County