Krause Pump Station

Client

City of Tampa

Location

225 S. Ashley Street, Tampa, FL

Size

60 million gallons per day

Project Description

The project comprised of demolition of the entire existing 60 MGD master pump station and all mechanical equipment including four vertical suction pumps from 100 HP to 400 HP and all associated piping and valves. Vogel Bros. Building Co. then installed four 400 HP pumps and immersible motors, discharge and suction valves, piping, concrete pedestal supports, air compressors; and installed four 480V variable frequency drives, pump controls, annunciator panel, motor control center, electrical switchgear, concrete duct bank system, conduits, wiring, and other electrical equipment needed to convert the pump station from 4160V service to 480V service with a new ventilation system. The contract included furnishing all labor, materials, and equipment to install a new 36” magnetic flowmeter outside the station. During the entire duration of the project, the pump station was placed on temporary bypass. The bypass pumped from several manholes and junction chambers to a 54” x 36” hot tap performed as part of the project.

Related Projects

Clermont East Side Water Reclamation Facility Expansion

City Of Clermont

Sunshine Water Services Mid-County WWTP MBR Improvements

Sunshine Water Services

Manatee NWWRF Equalization Tanks

Manatee County

Haines City WWTP

Haines City

Sunbridge Water Treatment Plant – Tavistock Dev.

Tavistock Development

Hillsborough County NW Regional Sludge Management Facility

Hillsborough County

Cherry Hill Water Production Facility

Polk County

Manatee Water Treatment Plant – Biological Treatment Unit

Manatee County