Installation of well pumps for a newly drilled potable water well and 2 older existing wells, testing and logging of 2 existing wells, 2.0 MG pre-stressed concrete ground storage tank, covered pump station with five 200 HP high service pumps and two 50 HP jockey pumps, prefab electrical building, generator, gas chlorination system in a prefab building along with storm water improvements and selected demolition of the existing water treatment facility