Dade City Wastewater Treatment Plant

Client

Dade City

Location

38303 Irvin Avenue, Dade City, FL

Size

1.5 million gallons per day

Project Description

Vogel Bros. served as the General Contractor for the comprehensive renovation of the Dade City Wastewater Treatment Plant, delivering critical process, mechanical, and safety upgrades to enhance overall plant performance and reliability.

The project included selective demolition of inactive basins and construction of a new sludge digester to improve solids handling and treatment efficiency. The disinfection system was converted to sodium hypochlorite, providing a safer and more efficient method of treatment.

Additional improvements included upgrades to two clarifiers, replacement of Return Activated Sludge (RAS), Waste Activated Sludge (WAS), and internal recycle (IR) pumps, as well as various safety and maintenance enhancements throughout the facility. Work was carefully phased and coordinated to maintain plant operations during construction.

Through strategic sequencing and close coordination within an active treatment environment, Vogel Bros. successfully delivered vital infrastructure improvements that strengthened system performance, operational safety, and long-term sustainability for the community.

Related Projects

Clermont East Side Water Reclamation Facility Expansion

City Of Clermont

Sunshine Water Services Mid-County WWTP MBR Improvements

Sunshine Water Services

Manatee NWWRF Equalization Tanks

Manatee County

Haines City WWTP

Haines City

Sunbridge Water Treatment Plant – Tavistock Dev.

Tavistock Development

Hillsborough County NW Regional Sludge Management Facility

Hillsborough County

Cherry Hill Water Production Facility

Polk County

Manatee Water Treatment Plant – Biological Treatment Unit

Manatee County